Additional works related to previous projects for Zain Telecommunications Company.

Iraq - Baghdad

Category:

1- Additional project I (Japanese Villa).

  • Repairing the roof of the building by removing the old Mastic and adding a new Mastic.

  • Doing electrical work, which includes adding lighting points.

  • Changing the sanitary tools in the bathrooms (washbasins, toilet seats, and faucets).

  • Conducting additional painting works for internal walls and ceilings.

  • Repairing the building’s sewers.

  • Installing and fixing two air conditions of 2 tons.

  • Preparing materials to replace the main water supply lines of the building with high pressure pipes.

 

2- Additional Project II (Car Park).

  • Preparing equipment and materials to scrape the ground then place a 10 cm space layer, and then levelling, spraying and dimming the land with an area of 1500 m.

 

3- Additional Project III (Japanese Villa).

  • Preparing the materials to install a partition of Gypsum Board and a door of wood; this work includes (repairing, painting, and adding decorative apron slab).

  • Preparing the materials to install a system of hot – cold water in the bathroom of security room; this work includes (installation, fixture, pump bases, power board, plug, connection and operation).

  • Installing and fixing a glass shower partition with 2 showers.

  • Installing and fixing air vents for bathrooms; this work includes (installation, fixture, and electrical connection).

 

4- Additional Project IV (Villa 3).

  • Preparing materials for the maintenance of bathrooms in the building.

  • Preparing the materials to install a partition of Gypsum Board and a door of wood; this work includes (repairing, painting, and adding decorative apron slab).

  • Preparing the materials to install a partition of glass with thickness of 10 cm and area of 8 m

  • Preparing the materials to change the points of light (Spot Light).

 

5- Additional Project V (Japanese Villa).

  • Preparing the materials to change bathroom accessories; this work includes (removing the old accessories and installing the new accessories). Number of bathrooms: 33.

 

6- Additional Project VI (Japanese Villa).

  • Preparing the materials to install a water tank with capacity of 5000 liters; this work includes (electrical wiring, electrical connections, change of push pumps, installation of umbrellas to protect the pumps, and installing electric board).