Repairing the roof of the building by removing the old Mastic and adding a new Mastic.
Doing electrical work, which includes adding lighting points.
Changing the sanitary tools in the bathrooms (washbasins, toilet seats, and faucets).
Conducting additional painting works for internal walls and ceilings.
Repairing the building’s sewers.
Installing and fixing two air conditions of 2 tons.
Preparing materials to replace the main water supply lines of the building with high pressure pipes.
2- Additional Project II (Car Park).
Preparing equipment and materials to scrape the ground then place a 10 cm space layer, and then levelling, spraying and dimming the land with an area of 1500 m.
3- Additional Project III (Japanese Villa).
Preparing the materials to install a partition of Gypsum Board and a door of wood; this work includes (repairing, painting, and adding decorative apron slab).
Preparing the materials to install a system of hot – cold water in the bathroom of security room; this work includes (installation, fixture, pump bases, power board, plug, connection and operation).
Installing and fixing a glass shower partition with 2 showers.
Installing and fixing air vents for bathrooms; this work includes (installation, fixture, and electrical connection).
4- Additional Project IV (Villa 3).
Preparing materials for the maintenance of bathrooms in the building.
Preparing the materials to install a partition of Gypsum Board and a door of wood; this work includes (repairing, painting, and adding decorative apron slab).
Preparing the materials to install a partition of glass with thickness of 10 cm and area of 8 m
Preparing the materials to change the points of light (Spot Light).
5- Additional Project V (Japanese Villa).
Preparing the materials to change bathroom accessories; this work includes (removing the old accessories and installing the new accessories). Number of bathrooms: 33.
6- Additional Project VI (Japanese Villa).
Preparing the materials to install a water tank with capacity of 5000 liters; this work includes (electrical wiring, electrical connections, change of push pumps, installation of umbrellas to protect the pumps, and installing electric board).