Project of rehabilitation and maintenance of a villa for Zain Telecommunications Company, Site No. 3, a two-story building

(Baghdad - Al Jadiriyah)

Category:

 1- Adding iron bars for doors and windows.

 2- Installing and fixing blast-proof protection film on glass doors and windows.

 3- Preparing the materials, manufacturing and installing guard caravans at the entrances to the building and preparing them for all housing requirements.

 4- Preparing the materials and casting the generator bases using ready-made concrete.

 5- Installing and fixing umbrellas to protect generators.

 6- Installing and fixing a power board and connecting it with the sources of power supply for the building.

 7- Installing and fixing lighting projectors for the building.

 8- Preparing the materials to conduct the extension works and set points of the Internet system.

 9- Preparing the materials to extend the wiring and install security cameras for the building.

 10- Installing water heaters for the building.

 11- Preparing the materials to carry out repairs and paint with high quality paints for walls and building ceilings.

 12- Preparing and install furniture.

 13- Carrying out the cleaning works for the building.