Project of rehabilitation and maintenance of the (Japanese) villa for Zain Telecommunications Company, high-rise building

(Baghdad - Al Jadiriyah)

Category:

 1- Adding iron bars for doors and windows.

 2- Preparing and installing blast-proof protection film on glass doors and windows.

 3- Preparing the materials to manufacture and install guard caravans at the entrances to the building.

 4- Preparing the materials to create an Emergency Exit for each floor and connect it to an outside staircase.

 5- Installing and fixing indoor lighting (Spot Light).

 6- Installing and fixing a fire alarm system for the building.

 7- Installing and fixing emergency lighting in all sections of the building.

 8- Installing and fixing an alarm system and connect it with the guard point of the building.

 9- Repairing the bathrooms and kitchens of the building.

 10- Repairing the air conditioning units in the building.

 11- Doing demolition, removal of rubble and application of a waterproofing membrane on the entrance floor of the building using alabaster stone.

 12- Doing the work of casting in different areas using the ready-made concrete.

 13- Making up the shortfall, repairing and dyeing the parts of the building’s ceiling made of Gypsum Board.

 14- Repairing the wallpaper inside the building sections.

 15- Installing and fixing umbrellas at the entrance and top of the building.

 16- Repairing the internal and external building doors.

 17- Doing construction and sprayer for the purpose of closing the openings in the exterior concrete blocks of the building.

 18- Drilling to connect and bury the main power cable for the purpose of supplying the building with electric power through the generator.

 19- Installing and fixing a power board and connecting it with the sources of power supply for the building.

 20- Preparing the materials to conduct the extension works and set points of the Internet system.

 21- Preparing the materials to extend the wiring and install security cameras for the building.

 22- Preparing the materials to carry out repairs and paint with high quality paints for walls and internal and external ceilings of the building.

 23- Carrying out the cleaning works for the building.